Fast Track: Securing Ukrainian Defence Export Permits in 30 Days (2026 Update)
Global Miltech Legal legal team
Experts in export control and defence law

Коротко
The Fast Track procedure, formalized by Cabinet of Ministers Resolution No. 875 (effective July 8, 2026), reduces the export license review period to 30 calendar days for approved Drone Deal partner nations. Managed by the State Export Control Service (SSECU), this mechanism bypasses standard Interdepartmental Commission reviews for non-critical goods, provided the hardware is codified, the exporter is registered, and the transaction complies with state defense priority safeguards.
To operationalize the Drone Deal initiative, the government of Ukraine has adopted Resolution No. 875, which introduces a dedicated, accelerated procedure for reviewing export license applications—the Fast Track. Effective as of July 2026, this instrument is designed to facilitate rapid market entry for Ukrainian manufacturers into partner countries while maintaining strict national security oversight.
How Fast Track Differs from Standard Procedures
- Review period reduced to a maximum of 30 calendar days.
- Licenses are issued by the SSECU, bypassing the Interdepartmental Commission for non-critical goods.
- Includes a 'silent consent' principle: if interagency partners (Ministry of Defence, SBU, etc.) do not provide feedback within strict deadlines (10–20 days), the permit process proceeds automatically.
- Exclusive to states that have signed a Drone Deal agreement with Ukraine and appear on the Ministry of Foreign Affairs' quarterly approved list.
Conditions for Fast Track Eligibility
The accelerated procedure maintains rigorous standards to protect domestic interests. Eligible goods must be codified or accepted into service by the Ministry of Defence. For transactions exceeding UAH 15 million, manufacturers must certify production surplus—demonstrating that export obligations do not conflict with domestic defense procurement needs. Furthermore, the Ministry of Defence, in coordination with the Interdepartmental Commission, maintains a quarterly 'List of Critical Goods' that remain restricted from expedited export.
Strategic Advantages of the 2026 Regulatory Framework
A major shift in the 2026 policy is the removal of the 'negotiation permit' requirement. Previously, companies had to wait for state authorization just to initiate contract talks. Under the new resolution, registered manufacturers can negotiate directly with foreign partners, significantly reducing the lead time for contract finalization and international integration.
Typical Causes for Application Rejection
- Incomplete end-user verification or missing government-backed guarantees.
- Hardware included on the current quarterly List of Critical Goods.
- Discrepancies between declared nomenclature and export control codes.
- Failure to provide verified evidence of production capacity/surplus.
30 days is the processing time for a correctly prepared application. Any return for revision resets the clock. Given the complexity of the new Resolution No. 875 requirements, precise preparation of the document package is 80% of the success.
Conclusion
The Fast Track procedure provides a robust opportunity to formalize long-term defense cooperation with EU and global partners. Global Miltech Legal prepares turn-key applications: from verifying nomenclature against current restricted lists to managing end-user documentation and SSECU filing. Contact us today for a professional case assessment.
Часті питання
Can any Ukrainian defence manufacturer use the Fast Track?
No. The procedure is limited to manufacturers registered with the SSECU whose products are codified by the Ministry of Defence and who can demonstrate production surplus without compromising domestic supply obligations.
What happens if my application is rejected for clerical errors?
If an application is returned for corrections, the 30-day review period resets. This makes precise preparation of the documentation package, particularly regarding end-use guarantees, essential to maintaining the expedited timeline.
Is the Fast Track available for all export destinations?
No. The Fast Track is restricted to states that have concluded a Drone Deal or similar defense cooperation agreement with Ukraine and are included in the Ministry of Foreign Affairs' quarterly updated list of eligible partners.
Do I need a separate permit to begin negotiations with a foreign buyer?
As of the July 2026 reforms under Resolution No. 875, manufacturers registered with the Ministry of Defence no longer require a separate 'negotiation permit' to begin contract discussions, allowing for faster commercial outreach.
Related services
Our experts
Pavlo Pavliv
CEO, Global Miltech Legal
Kyiv
Export process organisation · Contracts and international partnerships
Oleh Diakiv
Co-founder · CEO of PARABELLUM
Lviv
Contracts with foreign buyers · End-user certificates, JV, licensing
Mariia Overchenko
International Business Development
Krakow
International business development · Entry into new international markets · Building strategic partnerships · Communication with international partners
Planning to export defence products?
Global Miltech Legal handles the full cycle — from SECS registration to crossing the border. The initial case assessment is free.
Get a consultation